A manufacturer of industrial gas engines required a torque solution to secure engine block...
An oil refinery required two large valves to be opened and closed twice daily for cleaning...
The Problem:A large coal mine required a solution regarding the bolts for “Mining Heads” (...
The Problem:A rail freight company required a torque solution to speed up the process of r...
The Problem:A civil infrastructure company required a bolting solution to carry out the lo...
A diesel engine maintenance company required a solution as an alternative to their current...
A helicopter manufacturer needed to perform critical torque applications as part of the ro...
The Problem:A construction company contacted Specialised Force to combat an issue they wer...
Commissioning of Re Railing & Recovery Equipment at Customer Premises in the Pilbara (...
An oil and gas industry contractor planned to sandblast and paint a shell and tube heat ex...
An oil and gas industry contractor required Boltshield to help them solve a problem surrou...
A crude oil refinery required a solution to protect the nuts and bolts on a High Pressure ...
A gas company required a solution to protect the bolts on an ANSI 600 flange in a gas comp...
A popular eco-adventure company needed a more effective solution to check the tension on e...
A leading provider of high-tension cable barrier systems required a fast, effective and ac...
The Problem:The customer required a simple and accurate method of applying the correct cla...
The Problem:A heavy vehicle alignment group customer that provides professional and engine...
A mining company contacted our technical sales team in Carlton, requesting a solution for ...
The Problem:This project was for a bridge launching system where 4 by RSLC-1504 Durapac cy...
The Solution:For this transformer change out four RG-258 Durapac 25 ton cylinders with sta...
Durapac’s RG-252 cylinder was used in conjunction with a P-2200 two speed hand pump and HP...
The Problem:A major busy city transport bus workshop had an issue with lifting up buses in...
The Problem:Forklift Service Company needed to lift forklifts of different sizes, shapes, ...
A Durapac RD-5013 Cylinder was used to assist in the removal and replacement of old pipes ...
Our customer had an assembly and disassembly bench used for the maintenance of hydraulic c...
At the abutment end of a road bridge, three bearings had to be replaced which supported th...
The SAFE-D-LOCK™ isn’t just for heavy vehicles, it can also lift trains and locomotives.Th...
The Problem:The client wanted a product to change dump truck tyres.The Solution:SAFE-D-LOC...
The supporting structural steel columns underneath a multi story building needed to be rep...
The client needed to remove the track frames from a Hitachi EX5500 Hydraulic Excavator - o...
Durapac’s Synchronous Lift System (SyncMaster) with its computer controlled monitoring sys...
This 67m long, 17m wide bridge’s abutments and piers had moved significantly during earthq...
This rail contractor had a requirement to assemble insulated track panels prior to the ins...
The Problem:A solution was needed at a mine site regarding the bolting application on the ...
A gold mine contractor need a safer way to breakout large 145mm hexagon nuts. The Durapac ...
The Problem:The notorious flange-joint was difficult for the operator to align based on th...
The Problem:Dive teams had been unable to spread some of the hang‐off unit flanges due to ...
The Problem:Maintenance of a critical flange joint was required at a large water treatment...
The Problem:Equalizer was faced with a case involving reconfiguring the height of a tensio...
Equalizer Nut Splitter: Case Study - Removal of Corroded NutsThe Problem:The nuts on a API...
The Problem:The Standard SG (Secure Grip) tool was clashing with a nearby vessel meaning t...
The Problem:The standard "SG Series" (Secure Grip) tools would not fit the very large SPO ...
The Problem:Equalizer was faced with a case where a damaged quill was required to be remov...
A public utilities company required a solution to aid in the lifting of submersible pumps ...
This industrial electrical contractor needed to install multiple power and data cables int...
This electrical contractor needed to install four 120mm2 copper electric cables (0.6/1 KV)...
This installation of a large crane aboard an offshore rig was done on four 50-ton capacity...
A pipeline was laid to transport water which was injected into oil wells to maintain press...
Lateral roll was chosen for moving a structurally sound bridge in a well-known city suburb...
Hilman Rollers are an integral part of the rocket launch mission, adding safety and effici...
A series of pipe cradles were created to accomplish this outfall pipe launch. The cradles,...
This “fast-track” project replaced concrete bridge segments of the connecting ramps leadin...
A famous lighthouse weighing in at 4354 tonnes was required to be moved 884 metres from it...
Hilman Rollers proved to be a high capacity and low profile solution used for the onsite t...
Hilman Rollers provided an alternative lift & roll system for a rig. The cantilever be...
Hilman Rollers was called upon to design and manufacture a roller for moving specially fab...
36 tonne capacity specially modified Hilman Rollers were used to position individual preca...
A laboratory required a permanent installation of a structure which weighed 326 Tonnes. Th...
A civil infrastructure company required a solution to enable them to support waste conveyo...
A rail bridge required replacement due to ageing as well as the future plans for heavier f...
Specialised Force was contacted by a conveyor manufacturer who makes the belts used on min...
A customer contacted SF about utilising some hydraulic battery tools for cutting steel wir...
A garage door manufacturing company contacted us for a crimping solution. They provide and...
The Problem:A customer contacted us about a multi-port crimping die they needed to use to ...
In this application the Izumi model SL-ND series 6 tonne battery hydraulic crimper became ...
The Problem:A customer contacted Specialised Force as they required a solution to enable t...
The Problem:Joyce Dayton was contacted by a company that required components for a multi-p...
The Problem:During the construction process and throughout the life of of log homes, build...
The Problem:Joyce Dayton was required to combat and resolve two challenges given by a nucl...
Aluminium smelters are faced with the problem of maximising efficiency and potline up time...
The Problem:Joyce Dayton was contacted regarding a project to insert a retractable roof st...
The Problem:NASA Glenn Research Centre (GRC), located in Cleveland, Ohio, needed to replac...
The Problem:A Passenger Boarding Walkway was required to be designed for the loading and u...
The Problem:An oil rigging company requested that Joyce Dayton provide a solution to assis...
Designed for a leading international infrastructure group that finances, develops, builds ...
JUNG has 45 years of experience in the developing and manufacturing of rigging equipment. ...
This specialised pulling machine was supplied for Swagelining projects, in this instance i...
The contractor required a three tonne pulling winch for the installation of underground El...
The Problem:BridgePro was involved in a project with TasPorts for the Controlled Collapse ...
Emergency floating pontoons are used in military and defence force operations for numerous...
With ever increasing train speeds, the need to know that the designed catenary tension val...
The Problem:With the local salmon industry continuing to grow and the number of pens incre...
The Problem:A Civil Infrastructure company in Sydney contacted Specialised Force as they n...
A Tower Crane company contacted Specialised Force as they had a manual handling issue rega...
The Problem:As part of its work to maintain a safe road network, the Tasmanian Department ...
The defence force and air force require equipment that can sustain long periods of storage...
The Tangye range of Military Bridging Jacks is used extensively during army or defence for...
The Problem:A marine farm contacted Specialised Force as they required a solution to help ...
Being part of the armed forces involves more than just serving and protecting the country,...
An expedition team headed to Antarctica with a fleet of snow vehicles to transport them in...
Tirfor® is a registered trademark of the Tractel® Group. The Tractel® Group was founded in...
National Parks and councils often install canopy walks, canopy walkways, treetop walks/wal...
The Tractel Hydraulic Tirfor® “Supertirfors” are hydraulically powered hoists/winches that...
Webtool announced a gripping and lifting tool for recovering subsea umbilical and cable fo...
Emergency Disconnect if Tug Fails to Take ActionWebtool has developed a portable, emergenc...
Allspeeds has been awarded a contract to supply Webtool emergency disconnection tools for ...
...